Referenssit

Premekon on suunnitellut ja valmistanut hoitotasoja, porrastorneja ja teräsrakenteita jo useamman vuosikymmenen ajan sekä kotimaisille että kansainvälisille markkinoille. Alta löydät referenssejä asiakkuuksistamme sekä muutaman yksityiskohtaisemman artikkelin asiakkaidemme kokemuksista yhteistyöstämme.

Premekonin valmistamia teräsrakenteita on käytössä ympäri maailmaa

  • Zicunaga Espanja
  • IWU Finland
  • OCO Finland
  • Pecca Finland
  • NordiC Swan Finland
  • MFBTT, Metsä Group Äänekoski Suomi, 2016-2017
  • Hoitotasotoimitus, Valmet Technologies, Suomi
  • NOR2S Germany
  • FLASH Finland
  • Nippon USA
  • Modernpm4 Turkey
  • Paplabe1 Czech Republic
  • Norland Papier Germany
  • Bahia Pulp Brazil
  • Ishinon6 Japan
  • Wauna PM7 USA
  • HK 9 Japan
  • Tomioka Japan
  • Myble05 Finland
  • Myble07 Finland
  • Braviken Sweden
  • April 12 Indonesia
  • April 13 Indonesia
  • Sgoghall Sweden
  • Mönsterås Sweden
  • KYMI 700 Finland
  • OKI 1&2 Indonesia
  • Canonball 3 United States
  • MMKM3 Austria
  • TARU Finland
  • STETI Czech Republic
  • Woops Finland
  • Valmet
  • Metsä Group
  • Neste Oyj
  • Andritz
  • Stora Enso
  • Kemira
  • UPM
  • St1
  • Tamtron
  • Industri- Textil job
  • Veisto
  • Helen
  • Sumitomo
  • Vestek
  • BMH Technology
  • Metso
  • Mantsinen
  • YIT
  • Fortum
  • Raumaster
  • Konecranes
  • Caverion
  • Flotech

Half a million kilos of steel for an underground heat pump plant

Premekon supplied nearly half a million kilos of steel for Helen’s Eiranranta heat pump plant project. The scope of supply included pipe bridges, maintenance walkways and stair towers, spiral staircases, and frames for compartment walls. During the project’s active phase of one and a half years, the milestones agreed with the customer were successfully met. “Installation on site went really well. There were very few instances where steel components had to be remade or reworked,” says Project Manager Mikko Kaartinen. The amount of structural steel, the schedule and the ease of installation were optimised to accommodate the challenging environment and tight timeframe. Special solutions were incorporated into the design to allow the structures to be transported through a tunnel into the underground cavern and installed in confined spaces alongside other work. Kaartinen adds that this is precisely the added value Premekon brings to a project where the logistical challenges are greater than those of an above-ground installation. “Design and modelling have gone really well in this project. I want to thank you for the excellent work.” Mikko Kaartinen, Project Manager, Helen See the video for more information on this project. https://youtu.be/9mhtlAWG2PQ?si=Q2MmY1SeT41g5NpU